Status as of Jan. 18th 2008
Status of work completed after COA meeting
Leak Issues for 01 and 05 columns:-Completed
Sealed Windows on East and West
Sealed East Wall
Current no leaks found with work
Repair rooms damaged by water leaks - Completed
See info below
Lobby Floors - Completed
Tile floors
Need to replace a few on 6th floor
Updated Elevator tile
Garbage container - Completed
Moving to West side of building (last spot near road)
Added new wood fence to old spot
COA –needs to discuss what do with spot
Reattach power to Parking Lot lights on East side -Completed
All parking lights work
Replacement of Lights and Plugs on balcony -Completed
All lights and plugs on balcony replaced and working properly
Need to caulk around light
Add extension to Sand fence over dunes-Completed
Elevator -Completed
New stainless base added
Refurbished area in shaft to stop rust
Added new tile
Add new pump to remove water from shaft
Re-hanging Gates in hallways –Work in Progress
Not all gates have been rehung waiting on plastic hinges to replace rust metal hinges.
Pool Heater - Completed
Pool heater will be running all year long at 82 degrees during cool months then off during warm months.
Lock added to control usage
Re strap Lounge chairs – Work in Progress
The coral straps faded so we are re strapping to the green color.
Items on list for discussion:
Rust on Ocean front of building
Next work day paint the lower level by the pool.
Seal Windows on North side of building
Seal North and West walls
Hangers in Underground parking.
Discuss what to do with new storage place created by move of garbage can.
Need to touch up walls after tile work in lobbies
Work completed in each room:
Room
Status
Work to be done:
Actual Dec. 30th 2008
805
guest bedroom -ceiling
Drywall and paint
Scrape, mud and texture ceiling,Kiel water stains and paint
601
master bedroom window seal and paint around the area, master 15X15 cut out above shower
Drywall and paint
Mud, sand, re-caulk and paint window sill
604
Master bath shower sw corner water stain -dry
paint
Kiel ceiling and paint wall
605
kitchen nw corner ceiling water spot
paint
Kiel ceiling in kitchen
501
smells -guest bedroom - SE corner water preeld,window seal damp still,carpet pulled up no pad dry now , blinds taken down - Dining room - above windows paint peeled-dry,
Carpet, dry wall,paint, replace any damaged items
Mud, sand plus re-plaster ceiling SE corner. Mud, sand and re-paint window and under window & SE corner wall. Left ½ gallon of touch-up paint. Install carpet pad in middle room
401
smells guest - under window carpet damp, around winodw seal paint peeling bubbling
paint and carpet
Mud, sand and paint around window
404
NE corner of bunk bed ceiling water stain
paint
Kiel ceiling
301
guest bedroom - SE bottom wall water stains
paint and drywall
Scrape, mud, sand, orange pill and paint window
305
sw corner ceiling on master bedrrom and guest windiw seal bottom left corner
drywall and paint
Kiel ceiling,Scrape, drape, sand, mud, orange pill, caulk and paint window
201
master bedroom north wall under window stain and carpet wet and Dining room window seal
carpet, dry wall,paint, replace any damaged items
Kiel paint, sand, mud and paint in master bedroom. Paint, sand, mud and re-caulk dining room
205
smells - master bedroom clost ceiling, guest room window seal left SE
paint
Kiel ceiling in master bedroom closet, re-paint ,Micro ban,Sand, Mud, orange pill and paint window
101
master bedrrom water on window seal bottom stains. Guest paint peeling below window, dining room window seal paint peeling
drywall and paint
Kiel paint and re-caulk windowsill.,Scrape, mud, sand, orange pill middle bedroom, dining room and paint
105
guest SE side water stain damp and SE corner of ceiling, Kitchen SE corner ceiling above cupboard , dining room window water seal and damp all around.
drywall and paint
Scrape, mud, sand and paint
Leak Issues for 01 and 05 columns:-Completed
Sealed Windows on East and West
Sealed East Wall
Current no leaks found with work
Repair rooms damaged by water leaks - Completed
See info below
Lobby Floors - Completed
Tile floors
Need to replace a few on 6th floor
Updated Elevator tile
Garbage container - Completed
Moving to West side of building (last spot near road)
Added new wood fence to old spot
COA –needs to discuss what do with spot
Reattach power to Parking Lot lights on East side -Completed
All parking lights work
Replacement of Lights and Plugs on balcony -Completed
All lights and plugs on balcony replaced and working properly
Need to caulk around light
Add extension to Sand fence over dunes-Completed
Elevator -Completed
New stainless base added
Refurbished area in shaft to stop rust
Added new tile
Add new pump to remove water from shaft
Re-hanging Gates in hallways –Work in Progress
Not all gates have been rehung waiting on plastic hinges to replace rust metal hinges.
Pool Heater - Completed
Pool heater will be running all year long at 82 degrees during cool months then off during warm months.
Lock added to control usage
Re strap Lounge chairs – Work in Progress
The coral straps faded so we are re strapping to the green color.
Items on list for discussion:
Rust on Ocean front of building
Next work day paint the lower level by the pool.
Seal Windows on North side of building
Seal North and West walls
Hangers in Underground parking.
Discuss what to do with new storage place created by move of garbage can.
Need to touch up walls after tile work in lobbies
Work completed in each room:
Room
Status
Work to be done:
Actual Dec. 30th 2008
805
guest bedroom -ceiling
Drywall and paint
Scrape, mud and texture ceiling,Kiel water stains and paint
601
master bedroom window seal and paint around the area, master 15X15 cut out above shower
Drywall and paint
Mud, sand, re-caulk and paint window sill
604
Master bath shower sw corner water stain -dry
paint
Kiel ceiling and paint wall
605
kitchen nw corner ceiling water spot
paint
Kiel ceiling in kitchen
501
smells -guest bedroom - SE corner water preeld,window seal damp still,carpet pulled up no pad dry now , blinds taken down - Dining room - above windows paint peeled-dry,
Carpet, dry wall,paint, replace any damaged items
Mud, sand plus re-plaster ceiling SE corner. Mud, sand and re-paint window and under window & SE corner wall. Left ½ gallon of touch-up paint. Install carpet pad in middle room
401
smells guest - under window carpet damp, around winodw seal paint peeling bubbling
paint and carpet
Mud, sand and paint around window
404
NE corner of bunk bed ceiling water stain
paint
Kiel ceiling
301
guest bedroom - SE bottom wall water stains
paint and drywall
Scrape, mud, sand, orange pill and paint window
305
sw corner ceiling on master bedrrom and guest windiw seal bottom left corner
drywall and paint
Kiel ceiling,Scrape, drape, sand, mud, orange pill, caulk and paint window
201
master bedroom north wall under window stain and carpet wet and Dining room window seal
carpet, dry wall,paint, replace any damaged items
Kiel paint, sand, mud and paint in master bedroom. Paint, sand, mud and re-caulk dining room
205
smells - master bedroom clost ceiling, guest room window seal left SE
paint
Kiel ceiling in master bedroom closet, re-paint ,Micro ban,Sand, Mud, orange pill and paint window
101
master bedrrom water on window seal bottom stains. Guest paint peeling below window, dining room window seal paint peeling
drywall and paint
Kiel paint and re-caulk windowsill.,Scrape, mud, sand, orange pill middle bedroom, dining room and paint
105
guest SE side water stain damp and SE corner of ceiling, Kitchen SE corner ceiling above cupboard , dining room window water seal and damp all around.
drywall and paint
Scrape, mud, sand and paint